Quantity Surveying

Our quantity surveying service is the first turn key smart quantity surveying with smart BOQ generation, smart calculation error detection, we provide with the aid of:

Why Choose Us

  • Our ( Easy Tender ) Software.
  •  Fully integrated solution with Excel – AutoCAD.
  • Premavera- MS project links all project items document minimize change time and maximize efficiency .

Pre Tender Quantity Surveying

We create professional B.O.Q according to the international methods of measurement No mistakes no copy paste no typing and no missing of items. Quantity takeoff documented in well arranged forms that can be checked and reported

Tendering Stage Quantity Surveying

Rather than quantity detailed information provided that helps in pricing the project according to the actual calculated quantities which enables the estimator to price the items according to it is actual weight in the

project through ( Easy Tender ) software which is running in significant consultant and contracting companies the original B.O.Q can be imported and the calculated data can be exported to the same original excel file. The output provided with the detailed calculations that helps in case of winning the tender

Cost Control

Provide the reference data (Activity Based Cost)

Which enables the site engineer to report to the project manager the actual data that helps to control the cost of the project based on specific detailed activities rather than the general project activities

Implementation Stage

The Key of our services is to invest previous efforts, the calculation effort that spend in tendering stage will form the base to build on the detailed calculations needed for implementation purposes where the benefits can be summarized as:

  • Invest the Efforts from Tendering Stage
  • Helpful in Assigning Exact Resources to Activities in Estimating Process
  • Helpful in Procurement Process
  • Provides the Planner with the Key Resource of his work (the Quantity of the Activity where it will be Implemented )
  • Preparing Interim Payments
  • Value Engineering
  • Control of the Variation Orders
  • Cost Control